More boom work

Glueing in the false bottom and two GRP tubes. I have also added some inspection holes and carbon reinforcements for future mounting of hardware.

I started thinking about a gooseneck fitting and made a mock-up. Not sure if this will be the final design. See bottom two pictures.

Leave a Reply

Your email address will not be published. Required fields are marked *